h1. Basic timeline
2 1 Aleksander Bešir
3 1 Aleksander Bešir
"Gantt diagram":https://lusy.fri.uni-lj.si/redmine/projects/eneraptor/issues/gantt
4 1 Aleksander Bešir
5 1 Aleksander Bešir
by 7.12.2010:
6 2 Aleksander Bešir
- succesfully compile and run a test program on ARM9 (#4)
7 2 Aleksander Bešir
- establish "the logic" (#5)
8 2 Aleksander Bešir
- create function specifications (#6)
9 1 Aleksander Bešir
10 1 Aleksander Bešir
by 1.1.2011:
11 2 Aleksander Bešir
- a working archive and archive managment (#8)
12 2 Aleksander Bešir
- defining the GUI and other I/O elements (#9)
13 2 Aleksander Bešir
- connecting external hardware to ARM9 (sensor and all that fancy stuff) (#10)
14 1 Aleksander Bešir
15 1 Aleksander Bešir
by 1.2.2011:
16 2 Aleksander Bešir
- finalizing a working version of the system (live or as a simulation) (#11)
17 1 Aleksander Bešir
18 1 Aleksander Bešir
by 20.2.2011:
19 2 Aleksander Bešir
- prepairing the presentation (#12)
20 1 Aleksander Bešir
21 1 Aleksander Bešir
Key parts of the project:
22 1 Aleksander Bešir
- Activating ARM9 with a working OS
23 1 Aleksander Bešir
- The logic
24 1 Aleksander Bešir
- Archive and statistics
25 1 Aleksander Bešir
- Human Control Interface
26 1 Aleksander Bešir
- Presentation and documentation