Project

General

Profile

Actions

Basic timeline

Gantt diagram

by 7.12.2010:
- succesfully compile and run a test program on ARM9 (#4)
- establish "the logic" (#5)
- create function specifications (#6)

by 1.1.2011:
- a working archive and archive managment (#8)
- defining the GUI and other I/O elements (#9)
- connecting external hardware to ARM9 (sensor and all that fancy stuff) (#10)

by 1.2.2011:
- finalizing a working version of the system (live or as a simulation) (#11)

by 20.2.2011:
- prepairing the presentation (#12)

Key parts of the project:
- Activating ARM9 with a working OS
- The logic
- Archive and statistics
- Human Control Interface
- Presentation and documentation

Updated by Aleksander Bešir almost 14 years ago · 2 revisions