Basic timeline

Gantt diagram

by 7.12.2010:
- succesfully compile and run a test program on ARM9
- establish "the logic"
- create function specifications

by 1.1.2011:
- a working archive and archive managment
- defining the GUI and other I/O elements
- connecting external hardware to ARM9 (sensor and all that fancy stuff)

by 1.2.2011:
- finalizing a working version of the system (live or as a simulation)

by 20.2.2011:
- prepairing the presentation

Key parts of the project:
- Activating ARM9 with a working OS
- The logic
- Archive and statistics
- Human Control Interface
- Presentation and documentation