h1. Basic timeline
2
3
"Gantt diagram":https://lusy.fri.uni-lj.si/redmine/projects/eneraptor/issues/gantt
4
5
by 7.12.2010:
6
- succesfully compile and run a test program on ARM9
7
- establish "the logic"
8
- create function specifications
9
10
by 1.1.2011:
11
- a working archive and archive managment
12
- defining the GUI and other I/O elements
13
- connecting external hardware to ARM9 (sensor and all that fancy stuff)
14
15
by 1.2.2011:
16
- finalizing a working version of the system (live or as a simulation)
17
18
by 20.2.2011:
19
- prepairing the presentation
20
21
Key parts of the project:
22
- Activating ARM9 with a working OS
23
- The logic
24
- Archive and statistics
25
- Human Control Interface
26
- Presentation and documentation